Fastlane Glassgate 150 Plus enhances access control for a leading pension provider
As part of a phased renovation of its main premises, People’s Pension—a leading UK-based pension provider—expanded its operations within the Manhattan Building in Manor Royal, Crawley. This site, already in use for several business functions, saw a significant increase in staff presence and operational activity.
With this shift, a review of security was undertaken, and it was recommended that the organisation introduce a high-security, aesthetically sympathetic entrance control solution that would integrate seamlessly into the building’s premium reception environment, without compromising the integrity of the existing high-end flooring.
Syntinex Ltd was appointed to deliver the solution, partnering with Integrated Design Limited (IDL) to install Fastlane’s Glassgate 150 Plus speedlanes using a bespoke, non-invasive mounting system.
Project requirements
Key drivers for the installation included:
- Increased occupancy & sensitivity: Relocation of staff and business-critical functions to the Manhattan Building demanded tighter access control.
- High security & performance: The solution needed to provide reliable and secure access for authorised personnel and visitors.
- Aesthetic integrity: The entrance control solution had to align with and preserve the reception’s premium finish.
- Non-invasive installation: Protecting the building’s premium flooring was critical—no core drilling could take place.

The solution
Working closely with IDL, Syntinex supplied and installed one set of two and one single Fastlane Glassgate 150 Plus speedlanes. Recognising the need to preserve the high-end flooring, IDL custom-manufactured bespoke floor protectors. These enabled a secure, non-invasive installation that met both aesthetic and structural requirements.
To maintain a continuous and secure barrier line, the system also incorporated custom infill glass panels on either side of the speedlanes – designed to complement the reception layout and maintain visual cohesion.
As a UK-based manufacturer, IDL combines efficient production with exceptional quality assurance, offering rapid and reliable support. Local sourcing ensures short lead times, streamlined logistics, and fast access to replacement parts – enabling a seamless installation and long-term service reliability.
Product focus: Glassgate 150 Plus
The Fastlane Glassgate 150 Plus offers:
- Sleek stainless-steel and glass design
- High-throughput capabilities
- Accurate tailgate detection
- Multiple barrier height and customisation options
- A compact footprint ideal for space-sensitive environments
Its stylish and robust design, as well as bespoke service offered by IDL, made it the perfect fit for the professional, high-traffic environment at the Manhattan Building.
Project outcomes
Syntinex delivered a tailored, floor-safe access control solution that met all performance, aesthetic, and installation requirements. The Glassgate 150 Plus system has been well received by both the building’s management and its users.
Phil Allen, Regional Sales Manager UK & Ireland at IDL, comments:
“The Glassgate 150 Plus was the perfect choice for the People’s Pension installation, offering a sleek, high-security entrance solution that aligned seamlessly with the building’s premium interior. This particular project called for an innovative approach to preserve the high-end reception flooring, and thanks to a collaborative effort, bespoke floor protectors were manufactured to enable a completely non-invasive setup. Together with Syntinex’s design input and precision installation, we delivered a stylish, functional system with custom infill glass panels that maintain the aesthetic flow of the space. It’s a brilliant example of what can be achieved when great product design and expert integration come together.”
Jacques Lombard, Managing Director at Syntinex Ltd, adds:
“Working with IDL is always a smooth experience. Their products are UK-manufactured, which means rapid lead times, dependable support, and no disruption to our service delivery. It’s also easier for us to collaborate on custom elements like the floor mounting – their team is always responsive and proactive. That’s why IDL’s Fastlane products are consistently trusted by our installation teams and end users alike.”
To learn more about how Syntinex and Fastlane work together to enhance building access control capabilities, read: Meet the Installer – Jacques Lombard, Managing Director at Syntinex